The solid oxide electrolyser (SOEC) and the syngas compression system units were delivered in June by the ELCOGEN hydrogen production team to the BeBOP demonstration site, located at VTT premises. The 45-foot container hosting the SOEC infrastructure has been completed, leaving space for integration and testing, which are still ongoing, along with the construction of the MeOH synthesis unit.

